Wall Tiling – Part 2 : Flooring works

Wall Tiling – Part 2 : Flooring works

Procedure for Wall Tiling         Preparatory work before tiling:  Note that all electrical and plumbing wall chasing works for the concealed piping, bore holes etc. is complete before starting of wall tiling. Rough coat plaster : Rough coat plaster or first coat plastering for walls including corners  has neatly finished with line, level,…
Read more
Concrete – RCC Works – Part 1

Concrete – RCC Works – Part 1

Concreting works :   The following ingredients are necessary for obtaining good concrete in construction field. CEMENT The Cement grade and brand of cement should confirm IS 456: 2000 standards and is recommended by the respective project consultant. Each consignment of cement delivered to the project site must obtain Manufacturers test certificate (MTC) and should consumed…
Read more
Exterior Paints – Painting works – Part 2

Exterior Paints – Painting works – Part 2

Work Procedure for Exterior Paints Exterior primer :  The wall for which painting to be done, should be thoroughly scrapped with sand paper before painting. The application of painting is done using sprayer or by hard brushes for external application. First Coat & Second Coat :  Firstly, one stroke of brush or roller starting from…
Read more