Plastering works in Bangalore – Plastering

Plastering works in Bangalore – Plastering

Plastering works in Bangalore :  The word Plastering works in Bangalore or anywhere is used to define it is mortar cover smeared on the surface of walls and ceilings. The plaster not only eliminates the roughness of concrete or masonry surface but gives smooth and elegant required finishing. The plastering is used to prevent the…
Read more
Project Quality Consultant-Quality Auditing

Project Quality Consultant-Quality Auditing

Project Quality Consultant  Sri N. Srinivasa is a professional Civil Engineer having 27+ years of experience meeting the excellence level through construction project management. He has completed PMC, is a member of Institute of Engineers and registered Engineer in BBMP. He worked with many reputed Builders, Contractors and MNC’s and his own Construction Company. Career…
Read more
Brick Work – Masonry works

Brick Work – Masonry works

Brick work :  A.    Tools required for brick work: Masons Trowels (small and medium), Line thread, Sand Sieve, Spades, Pans, measuring  boxes, Metal tray, Tube levels, Plumb bobs, Measuring  Tape, Spirit levels 1-2 m, Aluminum straight edge, Right angle, Chipping Tools, Masons hammer, Levelling threads, Masons brushes and buckets, Water Barre and  Wheel barrows B.…
Read more
Safe Bearing capacity of Soil

Safe Bearing capacity of Soil

Foundation : The earth soil supporting a building structure should be strong enough to carry the live load. After  thorough exploration of the type of soil, ground water table, depth of rock obtained at foundation etc., the further stage is to go for an appropriate foundation required for the building structure. Safe bearing capacity of…
Read more
Formwork – Shuttering works

Formwork – Shuttering works

Formwork is a shape or mould comprising all supporting arrangements, used to outline and backing the concrete until it attains adequate strength to carry its self-weight. It shall accomplished to carrying all compulsory dead load and live load including its self – weight. 1. Requirements of good formwork PCC floor : Always the formwork should…
Read more
Termite Treatment in construction (ATT)

Termite Treatment in construction (ATT)

Purpose of Termite treatment: It is the treatment to Concrete structures to protect against attack by sub-terrain termites by appropriate chemical measures. This chemical treatment acts as a barrier for termites. The work shall be carried out by authorized pest control agency should produce a document of guarantee for satisfactory performance of termite treatment for…
Read more
MASONRY WORKS – BLOCK WORK

MASONRY WORKS – BLOCK WORK

Scope: This is to provide a method statement for construction of Block work in accordance with standard specifications and relevant drawings. Procedure : This work should be done in accordance with the standard specification and frequency of test to be conducted as per Quality Assurance Plan (QAP) Checks before Starting block work: Make sure that the…
Read more
EXCAVATION FOR BASEMENT AND FOOTING

EXCAVATION FOR BASEMENT AND FOOTING

Excavation works : TBM : For starting excavation works, for any structure, we need some reference points to proceed, hence, first and foremost thing is to establish Temporary Bench Marks (TBM) all round the project site. These TBMs are permanent in nature and should  clearly visible. Once these points are established, then by using paint…
Read more
Wall Tiling – Part 2 : Flooring works

Wall Tiling – Part 2 : Flooring works

Procedure for Wall Tiling         Preparatory work before tiling:  Note that all electrical and plumbing wall chasing works for the concealed piping, bore holes etc. is complete before starting of wall tiling. Rough coat plaster : Rough coat plaster or first coat plastering for walls including corners  has neatly finished with line, level,…
Read more