Like all civil construction works, flooring works in Bangalore or anywhere is plays very important role in construction industry as well as in public life.
This Tile installation works for buildings of any type whether it is new, existing or under construction, has to be tackled carefully with complete engineering knowledge, field experience, quality materials and by reliable professional agency, Flooring contractors or team of people.
While doing work, closely observe all minute details and see that no hollowness or brittleness are found anywhere in floors or walls.
If possible Standing Water test or regular sprinkling of water over all tiled surfaces is highly advisable and useful to be done after completion of flooring works.
All these above points and even more will be carried out by our company called My Home My Design have an expert team that handle all kinds of flooring works in Bangalore or anywhere by professional Tile installation contractors, team of experts as per engineering quality standards. These quality standards of flooring works in Bangalore or anywhere should follow the procedure for all new construction works like storage of tiles, surface preparation, cement mortar mixing, laying, Joint of tiles, grouting , skirting, curing etc., explained in detail with suitable photos and videos in this WEBSITE.
In addition find the details for wall tiles procedure as per quality standards like rough coat plaster, cutting of tiles, fixing, corner beads, shrink free, inspection procedure etc., explained in detail with suitable photos and videos in this BLOG.
While doing work, closely observe all minute details and see that no hollowness or brittleness are found anywhere in floors or walls.
If possible Standing Water test or regular sprinkling of water over all tiled surfaces is highly advisable and useful to be done after completion of flooring works.
All these above points and even more will be carried out by our company called My Home My Design have an expert team that handle all kinds of flooring works in Bangalore or anywhere by professional Tile installation contractors, team of experts as per engineering quality standards. These quality standards of flooring works in Bangalore or anywhere should follow the procedure for all new construction works like storage of tiles, surface preparation, cement mortar mixing, laying, Joint of tiles, grouting , skirting, curing etc., explained in detail with suitable photos and videos in this WEBSITE.
In addition find the details for wall tiles procedure as per quality standards like rough coat plaster, cutting of tiles, fixing, corner beads, shrink free, inspection procedure etc., explained in detail with suitable photos and videos in this BLOG.
Glimpses of our Flooring works in Bangalore
- Prompt and reliable flooring services with availability of Flooring Contractor
- Best and reasonable services, for all types of residential buildings, apartments, commercial complexes, Industrial, healthcare units etc.
- Trying level best solutions for challenging and crucial stage handing over, dampness and leakage issues.
- Usage of right material, tools, equipment, latest ideas and technologies to addressing all kinds of tiling work issues irrespective of quantum of work.
- Professional Tile laying contractors like Wood floor contractors,Tremix flooring contractor and experienced team of works
- Attending your needs of flooring works for Residential buildings, apartments, villas and commercial complexes like Granite, Marble, Vitrified tiles, ceramic tiles, Glazed tiles, Clay tiles, swimming pool tiles, Mangalore roof tiles etc.,
- All kinds of Industrial flooring, educational institutes, Hospitals and health care units
- Specialized flooring treatment like PU coating, Epoxy coating, VDF etc.,
Procedure for Wall Tiling
Preparatory work before tiling :
- Note that all electrical and plumbing wall chasing works for the concealed piping, bore holes etc. is complete before starting of wall tiling.
- Rough coat plaster : Rough coat plaster or first coat plastering for walls including corners has neatly finished with line, level, right angles and plumb.
- For proper bonding of wall tiling, wave lines markings to be done using binding wire over this plastered surface.
- It is highly advisable to start the rough coat plaster for walls after a completion period of 28 days of masonry walls constructed in block work or brick work.
- Similarly, the glazed tile, wall tiling or ceramic tiling work can start only after completion of 28 days of rough plastering, to facilitate shrinkage of plaster.
Fixing of Wall tiling :
- Cutting of tiles : Proper planning and care is required while cutting of tiles, so that the wastage can be minimized.
- The Cut tiles can be used for internal corners, and other places where full tile is not required.
- Ensure the distance from the skirting board or worktop to the top of the panel is fixed first only with full tiles, so that to facilitate the grouting gap.
- After the adhesive is allowed to dry, the border or edge tiles can easily be fixed over the wall.
- All Tiles are to be soaked in water for at least two hours before its use.
Wall tiling work :
- A cement paste with good consistency is applied on the back of the tile impressed on to the background surface and tapped mildly with a wooden or rubber mallet.
- Wall tiling work is done by fixing joints of 2.5 mm between tiles. To get uniform joint width in all directions, spacers of reputed brand is advisable.
- Proper skill, observation is required to keep all tiles perfectly in horizontal and vertical direction.
- By holding straight edge for horizontal lines, plumb bob for verticality, spirit level for top level, the required parameters can be achieved as per standards.
- Corner beads : All wall tiling corners to be provided with reputed PVC tile corner beading or strips so that tiling can be commenced beyond the beading.
- Shrink free : All joints to be filled with a branded non-shrink waterproofing filler material called shrink free of matching colour giving a minimum duration of 24 hours and finished slightly sunken.
Inspection Procedure for Quality Assurance :
- Check all tiles before its laying with MTC, random test reports by third party for its dimensions, durability, hardness, scratch proof etc.
- Grout colour : Ensure conformance of the wall tiling pattern, specifications including tile grout colour are as per drawings.
- Check for uniformity in line, level and grout thickness for visual appearance.
- Ensure straightness and level of wall tiling surface.
- Tile fixing : The fresh tiled surface should exhibit proper level by using Aluminium straight edge or line thread and spirit level or level tube for maintaining top level.
- Make sure, the cement and the sand have been checked or tested before starting of wall tiling
- Ensure that no tile is broken, damaged or cracked and the joints are well filled.
- Randomly, tap the tiled surface to check for hollowness.
- The tiled surface should covered with POP or tile protection sheets of reputed brand against damage to the tiled surface.
Wall tiling in progress
Bottom layer of wall tiling in progress
Corner beading for tile edges
Wall tiling completion
Connect with us to avail a complete construction services
CONTACT US
15/4, gurunath 2 A cross Hanumagirinagar, Chikkallasandra Main Road Subramanyapura,
Bengaluru – 560061
info@myhomemydesign.in
Our Happy Clients
Client Testimonials
I whole heartily congratulate the unique website “My Home My Design’ which gives immense pleasure and information about construction aspects. The top categories covers all topics of civil engineering & construction technology, highly useful to professionals & people wants to build their houses in a complete satisfactory manner without lack of engineering knowledge. Now they can proudly feel the happy results. I look forward more and more information in future which benefits all people throughout the country.
Shri Srinivasa Narasimaiah is a highly knowledgeable, practical man strict to the Quality Principles in construction methods as well as materials and not comprising at any cost.
LLP, Ex-President- RMC Readymix (India)
With 27 Plus years of vast Experience in construction field, Shri N.Srinivasa is Chief Quality Auditor, guide,strength &backbone for all our projects as far as quality & workmanship is concerned.
Really superb, this website shares immense knowledge about A- Z of construction activities in a standard and technical way. The ideas, caution, advice at suitable places highlights the creator’s practical exposure and experience in the subject. Similarly photos, description and videos gives immense knowledge for all construction aspects. I wish all the success for this website and likewise spread this useful information to the people across the globe.
PraveenShrusti Design Consultants
Shri Srinivasa Narasimaiah was the main pillar behind our Prana Medical centre construction from start to finish including Plan, Construction, Quality, workmanship and timely completion.Without his cooperation the project wouldn't have been completed on time.
MBBS and Chairman at PRANA MEDICAL CENTER, SPECIALIST CENTER FOR DIABETES, ENDOCRINE,
OBESITY. – Kodambakkam – Chennai- 600024
Previous
Next
Always Dedicated & Devoted
Latest Projects
Excavation for basement and footing
October 16, 2019
Compaction of Concrete
October 10, 2019
Building ByeLaws for Residential Buildings – All You Wanted to Know
September 22, 2019
How to Plaster Your House? Guide for Home Plastering
July 19, 2019
EXTERIOR PAINTS – PAINTING WORKS
July 19, 2019
CONCRETE – RCC WORKS IN CONSTRUCTION – PART1
July 19, 2019